Search results Design Checks and Required Competencies Temporary Works & Falseworks Design Checks and Required Competencies Prior to the commencement of the construction work, the proposed temporary works design should be checked for concept, adequacy, correctness and compliance with the requirements of the design... E19-design-checks-and-required-competencies Summary of the problem Vibration Hand Arm Vibration Syndrome Summary of the problem Workers whose hands are regularly exposed to excessive vibration may suffer from several kinds of injury to the hands and arms, including impaired blood circulation and damage to the nerves and muscles... C4-summary-of-problem Information to be contained in a report of thoroug LIFTING OPERATIONS AND LIFTING EQUIPMENT Thorough examination and inspection under LOLER Information to be contained in a report of a thorough examination The name and address of the employer for whom the thorough examination was made. The address of the... E12-information-contained-examination PPE Working On The Railways PPE It is imperative that personnel working on the railway can be clearly seen by train drivers and that the train drivers do not confuse the colour of clothing or PPE with signals which are red, yellow and green. Clothing and PPE containing... E25-ppe References Site Logistics and Planning Appendix 4 - CLOCS (Construction Logistics and Community Safety) Related references www.clocs.org.uk CLOCS resourceshttps://www.clocs.org.uk/resources.php The CLOCS Standardhttps://www.clocs.org.uk/page/clocs-standard Memorandum... a2-appendix-4-references Managing work related road risk in contracts Site Logistics and Planning Appendix 4 - CLOCS (Construction Logistics and Community Safety) Key Stakeholders A construction project has four key stakeholders, each providing positive influence and information. The main CLOCS requirements for each are outlined... a2-managing-work-related-road-risk-in-contracts Design of Scaffolding Work at Height Appendix 1 - Tube and Fittings Scaffolding CIP would like to acknowledge the National Access and Scaffolding Confederation (NASC) and Construction Industry Scaffolders Record Scheme (CISRS) for their support and for use of images which are copyright... E5-design-of-scaffolding-2 Other risks Hazard directory Working On The Railways Main risks and control measures Other risks/ Hazard directory Other hazards are: Confined spaces. These include box girders, closed arches, culverts, station basements, inspection pits, etc. Any entry into a confined space must be... e25-other-risks-hazard-directory STA Site Safe Policy Fire Timber Structures STA Site Safe Policy STA guidance is for all forms of structural building systems such as timber frame stud walls and sheathed frames, Structural Insulated Panels (SIPs), solid wood panels such as CLT and post and beam structures with... e3-sta-site-safe-policy Forms of Contract CDM Regulations Clients Forms of Contract The CDM Regulation requirements should be reflected in the contract or form of contract used to appoint consultants and contractors. Standard forms of contract will reflect the regulation requirements. The structure... b4-forms-of-contract 7 8 9 10 11 12 13 14 15 16