Search results 13.5.1 Main river - England and Wales WATER 13.5 PLANNING FOR CONSTRUCTION 13.5.1 Main River - Requirement for a permit or exemption England and Wales Through The Environmental Permitting (England and Wales) (Amendment) (No. 2) Regulations 2016, activities relating to flood risk related activities... 13-5-1-main-river-england-and-wales 13.6.2 Abstraction WATER 13.6 IMPOUNDING, ABSTRACTION AND DISCHARGE OF WATER ENGLAND AND WALES 13.6.2 Abstraction The Water Resources Act 1991 at s24 requires that no person shall abstract water from any source of supply or cause or permit any other person so to abstract any... 13-6-2-abstraction 13.9 Site Establishment WATER 13.9 SITE ESTABLISHMENT 13.9.1 Use of water standpipes s174 of the Water Industry Act 1991 makes it an offence, without the consent of the water undertaker, to attach any pipe or apparatus, to any resource main or water main and similarly s42 of the Fire... 13-9-site-establishment 4.3 Energy DESIGN 4.3 ENERGY Inefficient use of of energy in buildings can be significant and contribute to wider issues such as climate change. The incorporation of energy efficient measures into assets and the evaluation of operational energy impact can be addressed... 04-3-energy 4.9 Biodiversity DESIGN 4.9 BIODIVERSITY It is important to protect areas of high-quality landscape/biodiversity and to identify opportunities to enhance biodiversity through good design, even in urban areas. This may include: landscaping to incorporate wildlife habitats,... 04-9-biodiversity 11.11.5.4 Using unbound incinerator bottom ash aggregate (IBAA) in construction activities: RPS 325 WASTE 11.11 RECOVERY OF WASTE 11.11.5 Regulatory Position Statement and Low Risk Waste Position 11.11.5.4 Using unbound incinerator bottom ash aggregate (IBAA) in construction activities: RPS 325 RPS 325 applies if unbound IBAA is stored and used as... 11-11-5-4-using-unbound-incinerator-bottom-ash-aggregate -ibaa-in-construction-activities:-rps325 11.10.4.2 Written Information / Waste Transfer Not WASTE 11.10 TRANSFER OF WASTE 11.10.4 Transferring non-hazardous waste 11.10.4.2 Written Information / Waste Transfer Note - Required details England and Wales In England and Wales, the written information must identify the waste by reference... 11-10-4-2-written-information-waste-transfer-note- Water Management and Isolation in Buildings Health and Safety in Offices Water Management and Isolation in Buildings The CIREG water standard (formally CIREG’s Managing Escape of Water Risk best practice guidance) is an insurer-endorsed approach that aims to prevent and limit damage from escape of... e23-water-management-and-isolation-in-buildings Erection Procedures Lifting Operations and Lifting Equipment Tower Cranes Erection procedures A competent tower crane erector should be employed to erect a crane in accordance with the manufacturer’s instructions. Within the crane erection team, there needs to be an ‘crane... E12-erection-procedures Inspection of MCWPs LIFTING OPERATIONS AND LIFTING EQUIPMENT Mast Climbing Work Platforms (MCWP) Inspection of MCWPs The purpose of a technical inspection or Thorough Examination is to ensure that an MCWP is safe to be taken into, or to continue in use. It is in addition to any... e12-inspection-of-mcwps 46 47 48 49 50 51 52 53 54 55