Search results Selection Mobile Plant and Site Transport Safe Vehicles Selection (change all vehicles to machines) There is a growing practice within the construction industry of utilising mobile plant and transport for functions for which they were not primarily designed.... D5-selection Maintenance and Repair Mobile Plant and Site Transport Safe Vehicles Maintenance and repair Poor maintenance leads to construction vehicles being used in a bad mechanical state and often leads to injury producing accidents. PUWER requires all vehicles to be maintained in such... D5-maintenance-and-repair Working On Slopes Mobile Plant and Site Transport Safe Driving and Work Practices Working on slopes Where vehicles need to be used on slopes, and where no suitable alternatives exist, care should be taken to ensure that the specific vehicles are designed and selected to... D5-working-on-slopes 10.5.2 2 Planning to reduce nuisance Nuisance 10.5 CONSTRUCTION GOOD PRACTICE 10.5.2 Design and Planning 10.5.2.2 Planning to reduce nuisance Project sequencing is a key consideration where the likelihood of nuisance issues arising can be addressed. For example, demolition could be commenced in... 10-5-2-2-planning-to-reduce-nuisance 13.5.1 Main river - England and Wales WATER 13.5 PLANNING FOR CONSTRUCTION 13.5.1 Main River - Requirement for a permit or exemption England and Wales Through The Environmental Permitting (England and Wales) (Amendment) (No. 2) Regulations 2016, activities relating to flood risk related activities... 13-5-1-main-river-england-and-wales Further Sources of Information Waste Further Sources of Information Websites Regulation and guidance Statutory Guidance England and Wales Waste duty of care code of practicehttps://www.gov.uk/government/publications/waste-duty-of-care-code-of-practice Scotland Duty of care: code... 11-further-sources-of-information 0.2 Site Offices and Fit-out Setting up on Site 0.2 Site Offices and Fit-out 0.2.1 General appearance The condition, appearance and upkeep of site offices is a mirror of the image and standards of an organisation. Appearance and upkeep also reflect on a business’s responsibility for... 0-2-site-offices-and-offices-fit-out 13.10.12 Be prepared for Emergency Spill Response WATER 13.10 Construction Good Practice 13.10.12 Be prepared for Emergency Spill Response Two fundamental principles of environmental legislation are the polluter pays and strict liability that is, as noted above, if pollution occurs a prosecution can follow... 13-10-12-be-prepared-for-emergency-spill-response 11.8.6 Separation and storage of waste on-site WASTE 11.8 STORAGE OF WASTE 11.8.6 Separation and storage of waste on-site The purpose of separating different waste streams before they are collected for reuse, treatment or disposal is to improve the quantity and, by preventing cross-contamination, the quality... 11-8-6-separation-and-storage-of-waste-on-site 11.10.4.2 Written Information / Waste Transfer Not WASTE 11.10 TRANSFER OF WASTE 11.10.4 Transferring non-hazardous waste 11.10.4.2 Written Information / Waste Transfer Note - Required details England and Wales In England and Wales, the written information must identify the waste by reference... 11-10-4-2-written-information-waste-transfer-note- 45 46 47 48 49 50 51 52 53 54