Search results Offshore Wind Farms Work Over Water Offshore Wind Farms The Construction (Design and Management) Regulations 2015 (CDM2015) are legally binding on all construction work relating to offshore wind and wave electricity generation facilities. This is due to the following legislation: ... E10-offshore-wind-farms 13.5.3 Works on or adjacent canals WATER 13.5 PLANNING FOR CONSTRUCTION 13.5.3 Works on or adjacent canals England and Wales The Canal and River Trust (C&RT), run as a charity, has responsibility for the operation and maintenance of all canals in England and Wales. In Scotland the British... 13-5-3-works-on-or-adjacent-canals 13.5.1 Main river - England and Wales WATER 13.5 PLANNING FOR CONSTRUCTION 13.5.1 Main River - Requirement for a permit or exemption England and Wales Through The Environmental Permitting (England and Wales) (Amendment) (No. 2) Regulations 2016, activities relating to flood risk related activities... 13-5-1-main-river-england-and-wales 13.10.10 Hydrodemolition WATER 13.10 Construction Good Practice 13.10.10 Hydrodemolition Hydrodemolition uses high pressure water jetting to remove concrete, asphalt, grouts and soils. It is often used for localised restoration rather than large scale demolition. For example, to remove... 13-10-10-hydrodemolition 11.11.8 Recovery of waste - GBRs, Low Risk Waste Activities and SEPA Position statements WASTE 11.11 RECOVERY OF WASTE 11.11.8 Recovery of waste - GBRs, Low Risk Waste Activities and SEPA Position statements Scotland With the coming into force of The Environmental Authorisations (Scotland) Regulations 2018 (EASR) as amended by The Environmental... 11-11-8-recovery-of-waste- gbrs-low-risk-waste-activities-and-sepa-position-statements Part 3 Construction (Design and Management) Regulations 2015 Part 3 - Health and Safety Duties and Roles General duties 8.—(1) A designer (including a principal designer) or contractor (including a principal contractor) appointed to work on a project must have... B4-part-3 Care, maintenance and testing Asbestos Appendix 2 - Protective Equipment and Clothing Respiratory Protective Equipment (RPE) Care, maintenance and testing of RPE The RPE must be checked to ensure it is clean and in good working order before it is given to the wearer, and before it goes... c5-care-maintenance-and-testing Solar Panels: PV Photo voltaic installations SPECIALIST/SPECIFIC PROCESSES, RISKS AND COMPONENTS Solar Panels - PV Photo voltaic installations A PV Array is a mechanically and electrically integrated assembly of PV modules, and other necessary components, to form a DC (Direct Current) power supply unit The... e24-solar-panels-pv-photo-voltaic-installations Personal and Respiratory Protective Equipment Asbestos Working with Asbestos Containing Materials (ACMs) Aspects relevant to all work on asbestos containing materials Personal and Respiratory Protective Equipment Personal protective equipment, such as protective head protection, footwear, hand, eye and... c5-personal-and-respiratory-protective-equipment Appendix 1 - Modern Methods of Construction Design APPENDIX 1 MODERN METHODS OF CONSTRUCTION (MMC) Modern Methods of Construction (MMC) is a wide term, covering a range of offsite and onsite techniques. MMC provides adaptations as well as alternatives to traditional methods and has the potential to deliver... 4-appendix-1-mmc 8 9 10 11 12 13 14 15 16 17