Search results 11.11.5.8 RPS301 Using whole waste tyres WASTE 11.11 RECOVERY OF WASTE 11.11.5 Regulatory Position Statement and Low Risk Waste Position England and Wales 11.11.5.8 Using whole waste tyres RPS301 Provided the conditions in RPS301 are complied with, whole waste tyres can be used in building... 11-11-5-8-rps301-using-whole-waste-tyres Siting of Cranes/Ground and Supporting Structure Conditions Lifting Operations and Lifting Equipment Siting of Cranes/Ground and Supporting Structure Conditions The siting of the cranes must take into account: Ground conditions, including any slope Proximity to other cranes Proximity to other hazards for example... e12-siting-of-cranes-ground-and-supporting-structure-conditions Hazards and Precautions Site Logistics and Planning Site workshops and offices Hazards and precautions Battery charging When Lead Acid batteries are being charged, they give off hydrogen which is an explosive gas. Battery charging should therefore take place in a room, or area, which... a2-hazards-and-precautions Further Sources of Information MATERIALS FURTHER SOURCES OF INFORMATION WEBSITES Regulation and guidance England, Wales and Scotland Netregs, a partnership between SEPA and NIEA provides environmental good practice guidance for the whole UK and environmental regulatory guidance directly... 09-further-sources-of-information 13.10.8 Preparing for discharge by on site treatment WATER 13.10 Construction Good Practice 13.10.8 Preparing for discharge by on site treatment Proprietary treatment techniques are available such as "Siltbuster", "SmartSponge" and "Watermaiden" which can remove silt, concrete and oil to acceptable levels prior... 13-10-8-preparing-for-discharge-by-on-site-treatment 13.10.9 Activities involving grouts or other media WATER 13.10 Construction Good Practice 13.10.9 Activities involving grouts or other media for the purpose of sealing or ground stabilisation Activities that involve the injection of cement or cement/PFA grouts or other media for the purpose of sealing boreholes... 13-10-9-activities-involving-grouts-or-other-media 13.10.12 Be prepared for Emergency Spill Response WATER 13.10 Construction Good Practice 13.10.12 Be prepared for Emergency Spill Response Two fundamental principles of environmental legislation are the polluter pays and strict liability that is, as noted above, if pollution occurs a prosecution can follow... 13-10-12-be-prepared-for-emergency-spill-response 13.6.9 Penalties for offences WATER 13.6 IMPOUNDING, ABSTRACTION AND DISCHARGE OF WATER SCOTLAND 13.6.9 Penalties for offences Penalties for offences under EASR 2018 are currently on summary conviction a fine of up to £40,000 and/or up to 12 months imprisonment and, if the offence... 13-6-9-penalties-for-offences Primary Legislation (Acts etc.) Register of Legislation 4 DESIGN LEGISLATION Acts - Primary Legislation Legislation Title England Wales Scotland Summary of requirements relevant to construction and the environment ... 03-4-primary-legislation-acts-etc Secondary Legislation (Statutory Instruments - Reg Register of Legislation 9 MATERIALS LEGISLATION Statutory Instruments Regulations, Orders - Secondary legislation Legislation Title England Wales Scotland Summary of requirements relevant to construction The Control of Pollution (Oil Storage)... 03-9-secondary-legislation-statutory-instruments-r 18 19 20 21 22 23 24 25 26 27