Search results 4.1 Introduction DESIGN 4.1 Introduction Around 80% of environmental impacts are determined by decisions taken at the design stage and a consequence of those decisions can be both waste and pollution. Design, therefore, plays a crucial role in minimising the environmental... 04-1-introduction Services Exclusion zones Overhead and Underground Services Underground services Services Exclusion zones For underground services, the exclusion zone is defined as the horizontal distance from either side of the outside dimensions of any buried service and extends to the surface with... e18-services-exclusion-zones Pre-contract Appraisal Site Logistics and Planning Pre-contract appraisal and determining requirements Prior to work starting on site, the pre-construction information should be closely studied by the Principal Contractor and the following steps taken, ensuring that, where appropriate,... a2-pre-contract-appraisal Introduction ECOLOGY 7.17 INVASIVE PLANT SPECIES Introduction Invasive plants are those, generally non-native to the UK and introduced deliberately or accidentally, which can rapidly spread and take over areas to the detriment of other existing plant and animal species and... 07-17--introduction 13.6.5 General Binding Rules WATER 13.6 IMPOUNDING, ABSTRACTION AND DISCHARGE OF WATER SCOTLAND 13.6.5 General Binding Rules (GBR) In addition to the water activities that require authorisation by Notification, Registration or Permit there are several activities that may be encountered... 13-6-5-general-binding-rules 5.4 Example questions - prequalification PROCUREMENT OF SUBCONTRACTORS, DESIGNERS AND SUPPLIERS 5.4 Prequalification or Tender Questionnaires Prequalification and tender questionnaires should include questions on social value delivery, such as local employment, skills development, and community... 05-4-example-questions-to-include-in-prequalificat Work near excavations pits, water, embankments and earthworks Mobile Construction Equipment and Transport Safe Driving and Work Practices Work near excavations, pits, water, embankments and earthworks The CDM Regulations require 'suitable and sufficient measures shall be taken so far as to prevent any vehicle from falling... D5-work-near-excavations 11.5.2.1 Legal requirements WASTE 11.5 ENVIRONMENTAL PERMITTING/ WASTE MANAGEMENT LICENSING 11.5.2 Environmental permitting England and Wales 11.5.2.1 Legal requirements Section 33 (1) of the Environmental Protection Act 1990 (EPA1990) requires that "a person shall not" - deposit... 11-5-2-1-legal-requirements 1.3 Planning for environmental protection AN INTRODUCTION TO ENVIRONMENTAL MANAGEMENT 1.3 PLANNING FOR ENVIRONMENTAL PROTECTION With an awareness of all the requirements for environmental management placed on an organisation, the activities to be undertaken must be planned to ensure that these requirements... 01-1-3-planning-for-environmental-protection 2.5 Other Regulators THE LEGISLATIVE PROCESS 2.5 OTHER REGULATORS Marine Management Organisation Marine Consents Unit Marine Licensing Operation Team In England and Wales, the Marine Management Organisation (MMO) is an executive non-departmental public body established and given... 02-5-other-regulators 11 12 13 14 15 16 17 18 19 20