Search results What Is Thorough Examination Lifting Operations and Lifting Equipment Thorough Examination (Inspection, Testing and Maintenance) What is a Thorough Examination? The purpose of thorough examination is to subject lifting equipment and lifting accessories to an engineering based scrutiny at... E12-what-is-thorough-examination Testing Lifting Operations and Lifting Equipment Thorough Examination (Inspection, Testing and Maintenance) Testing Thorough examination may include testing. The need for testing of lifting equipment should be decided by a competent person with the necessary engineering... E12-testing What is an Inspection? Lifting Operations and Lifting Equipment Thorough Examination (Inspection, Testing and Maintenance) What is an Inspection? The purpose of formal inspection is to monitor equipment while it is in use, so that any defects which could give rise to danger are identified... e12-what-is-an-inspection Information to be contained in a report of thorough examination LIFTING OPERATIONS AND LIFTING EQUIPMENT Thorough Examination (Inspection, Testing and Maintenance) Information to be contained in a report of a thorough examination The name and address of the employer for whom the thorough examination was made. The address... E12-information-contained-examination Provision of Information Demolition Tendering Provision of information The client has duties to provide adequate pre-construction information (PCI), and under CDM 2015, where there is more than one contractor working on a project appoint a Principal Designer (PD) and Principal... E6-provision-of-information Pre Contract Activity Demolition Pre-contract activity Once a demolition contract has been awarded, the following steps should be taken before work starts: Appropriate notifications The following notifications, relating to safety and health, may be necessary: Six weeks... E6-pre-contract-activity Protection of the Public Demolition General considerations and precautions Protection of the public Demolition is frequently carried out in heavily populated areas and particularly high standards of site protection, safe systems of work and effective supervision are therefore... E6-protection-of-public References Erection of Structures References Legislation Management of Health and Safety at Work Regulations 1999 Personal Protective Equipment at Work Regulations 1992 Provision and Use of Work Equipment Regulations 1998 Construction (Design & Management) Regulations... E16-references Procedural Control Temporary Works & Falseworks Procedural control In conjunction with the risk mitigation approach of applying categories to temporary works, BS5975-1:2024 includes recommendations and guidance on control and management. The standard advises on staff... E19-procedural-control Erection And Construction Temporary Works & Falseworks Erection and construction Checking and inspection by competent TWSs should be a continuous process, starting with the materials to be used, the foundations, and progressive inspection and checks as the structure is erected. Leaving... E19-erection-and-construction 90 91 92 93 94 95 96 97 98 99