Search results Material Storage Erection of Structures Site Conditions Material storage Appropriate areas should be allocated by the principal contractor for stacking and storing components and should be clearly marked on site plans. These areas should be: Clear of obstruction,... E16-material-storage Steel Erection Erection of Structures Method Statement Checklists Checklist for steel erection method statement Steel erection method statements should normally include the following so far as is relevant in the circumstances:- Name(s) and address(es) of the contractors... E16-steel-erection Timber Frame Erection Erection of Structures Method Statement Checklists Checklist for timber frame erection method statements Method statements for timber frame erection should normally include the following so far as is relevant in the circumstances Name and address of the contractor... E16-timber-frame-erection Signing Mobile Plant and Site Transport Safe Workplaces Signing Site pedestrian and construction vehicle signs and road markings should be provided to the standards set by the Health and Safety (Safety Signs and Signals) Regulations 1996. To ensure a standard approach,... D5-signing Tipper Lorries Mobile Plant and Site Transport Specific vehicles Tipper lorries One of the main problems with these vehicles, when they are used on site, is instability which usually occurs on unmade or uneven ground which causes rear-tipping lorries to... D5-tipper-lorries Planning For Delivery Mobile Plant and Site Transport Planning for Delivery and Provision of Safe Access onto Delivery Vehicles Planning of safe loading and storage areas must be considered as early as possible in the planning process to ensure these areas suit the nature of the deliveries,... D5-planning-for-delivery Use Of Work Equipment To Prevent Falls Mobile Plant and Site Transport Use of work equipment to prevent falls Where preparation for loading or unloading cannot be carried out from ground level and access to the vehicle or trailer is required, a safe access or working platform should be provided. Gaps... D5-use-of-work-equipment-to-prevent-falls Air Sampling The Control of Hazardous Substances Determining Exposure Levels Air Sampling When there is a need for air sampling a standard collection method is generally used. The sample is usually removed from the air on a filter, charcoal tube, porous polymer tube, bubbler... C2-air-sampling Record Keeping For Control Measures The Control of Hazardous Substances Record keeping for control measures The assessments and actions taken should be recorded. In practice, most construction companies will use a limited range of materials and usage will be very similar from site to site. It is... C2-record-keeping-for-control-measures Traffic Control Roadworks Signing for roadworks Traffic control For two-way traffic to be maintained past the roadworks, there must be an unobstructed road width of at least 6.75m if on a bus route, or 5.5m if there is no bus route. Where roadworks do not permit two-way traffic,... E20-traffic-control 31 32 33 34 35 36 37 38 39 40