Search results 10.5.1.2 Stakeholder and Community Engagement Nuisance 10.5 CONSTRUCTION GOOD PRACTICE 10.5.1 Establish and Maintain Good Public Relations 10.5.1.2 Stakeholder and Community Engagement Engagement with key stakeholders and the local community at an early stage can lead to individuals feeling informed and... 10-5-1-2-stakeholder-and-community-engagement Receiving Equipment on Site Lifting Operations and Lifting Equipment Receiving equipment on site Lifting equipment used on site will normally be either owned by the user or hired from a plant company. When lifting equipment arrives on site it should be checked to ensure that it is the... E12-receiving-equipment-on-site Record Keeping Lifting Operations and Lifting Equipment Thorough Examination (Inspection, Testing and Maintenance) Keeping of Reports A user of lifting equipment must ensure that reports of thorough examinations and other documents such as EC declarations of conformity and... E12-record-keeping Reports and Defects Lifting Operations and Lifting Equipment Thorough Examination (Inspection, Testing and Maintenance) Reports and Defects The person carrying out the thorough examination must make out a report as soon as possible and the report must be in writing. The report... E12-reports-and-defects Site Boundary Site Logistics and Planning General arrangements Site boundary At all sites where it is reasonably practicable to do so, a fence should be erected enclosing all construction activities. It is also a requirement under the CDM Regulations that Principal Contractors... a2-site-boundary PPE Controls Noise Considering and implementing control measures PPE Controls Hearing protection should be issued to employees: Where extra protection is needed above what can be achieved using noise control As a short-term measure while other methods of controlling... C3-PPE-controls Reach The Control of Hazardous Substances REACH REACH is a European Union regulation concerning the Registration, Evaluation, Authorisation and restriction of Chemicals. It came into force on 1 June 2007 and replaced several European Directives and Regulations with... C2-reach 5.5.2 Generic requirements PROCUREMENT OF SUBCONTRACTORS, DESIGNERS AND SUPPLIERS 5.5 Generic and particular requirements to include in tenders/contract for designers, subcontractors or suppliers 5.5.2 Generic Requirements Consider including the following requirements in tender/ contract... 05-5-2-generic-requirements 11.10.2.1 Registration WASTE 11.10 TRANSFER OF WASTE 11.10.2 Carriers, brokers and dealers 11.10.2.1 Registration England and Wales, The Waste (England and Wales) Regulations 2011 introduced a two-tier system of registration for waste carriers, brokers and dealers together with... 11-10-2-1-registration Occupational Health Providers Managing Health and Wellbeing in Construction The Effects of Work on Health Occupational Health Providers It’s important to remember that GPs are key to supporting people with general health issues, but they are not OH experts. Therefore, you... C1-occupational-health-providers 17 18 19 20 21 22 23 24 25 26