Search results Equipment to minimise the height and consequences of a fall Mobile Construction Equipment and Transport Equipment to minimise the height and consequences of a fall If it is not possible to work from the ground or provide full edge protection, the height and consequences of a fall must be minimised. Collective Fall Arrest In... D5-equipment-to-minimise 1.6.2 ISO 14001 AN INTRODUCTION TO ENVIRONMENTAL MANAGEMENT 1.6 ENVIRONMENTAL MANAGEMENT SYSTEMS AND ENVIRONMENTAL STANDARDS 1.6.2 ISO 14001 ISO 14001: Environmental management systems -- Requirements with guidance for use. ISO 14001 is the widely recognised international standard... 01-1-6-2-iso-14001 Guidance Register of Legislation Appendix 1 Statutory, Non-statutory and other Guidance and Standards Non-statutory and Other Guidance Guidance (Description is shown for the guidance for England. The similar guidance for Wales and Scotland is shown beneath) Permitting... 03-Guidance What existing models are there? Managing Health and Safety in a Construction Business Common Development Phases for Safety Management Developing a Safety Management System What existing models are there? A variety of models exist, all of which have their supporters. However, there is no legal... a1-what-existing-models-are-there 13.5.4 Authorisation of water activities WATER 13.5 PLANNING FOR CONSTRUCTION 13.5.4 Authorisation of water activities 13.5.4.1 Legal requirements Scotland Under The Environmental Authorisations (Scotland) Regulations 2018 (EASR), as amended by The Environmental Authorisations (Scotland)... 13-5-4-authorisation-of-water-activities 13.7 Discharge to sewer WATER 13.7 DISCHARGE TO SEWER An alternative means of removing potentially polluting liquid from construction works is to discharge to a combined/foul sewer, although this requires prior approval and written consent from the sewerage 'undertaker'. Any liquid,... 13-7-discharge-to-sewer 13.9 Site Establishment WATER 13.9 SITE ESTABLISHMENT 13.9.1 Use of water standpipes s174 of the Water Industry Act 1991 makes it an offence, without the consent of the water undertaker, to attach any pipe or apparatus, to any resource main or water main and similarly s42 of the Fire... 13-9-site-establishment Water Management and Legionella Control Health and Safety in Offices Water Hygiene and Legionella Control All water systems shall be managed so as to control the risk of Legionella proliferation, in accordance with the Health and Safety Executive’s Approved Code of Practice L8 and supporting... E23-water-management-and-legionella-control Water Management and Isolation in Buildings Health and Safety in Offices Water Management and Isolation in Buildings The CIREG water standard (formally CIREG’s Managing Escape of Water Risk best practice guidance) is an insurer-endorsed approach that aims to prevent and limit damage from escape of... e23-water-management-and-isolation-in-buildings 21 22 23 24 25 26 27 28 29 30